Tag Archives: LVL
Raining outside, framing inside
Work begins on the deck
Rain has caused delay, so work on the deck began immediately after the slab was poured.
Our first LVL beam in place.The vertical metal straps cast into the foundation will attach to the future glue lam frame of the house.Detail showing the sill sealer gasket between the sill plate and the foundation. Also, the LVL beam above is glued in place. From the beginning of construction all joints and connections are carefully glued and sealed air tight on the passive house.Connection point on an i-beam glued and sealed in place.At the end of the first day, 14″ LVL and PSL beams installed.