The site surrounding the excavation was prepared so that the concrete truck could drive around the edge of the excavation throughout the pour.
Tag Archives: foundation
The first cement truck arrives
Waiting for the pour
Forms with rebar ready to fill
Layering insulation under the footing
Dan Gregg, the foundation subcontractor, sets the the double layer of 2- inch thick foam sheets in an overlapping arrangement. This Formular 400 rigid foam insulation is XPS and will be used in limited amounts where the compressive strength is required.