Finish grading of the South end walkout after the drainage and radon pipes are covered.Looking South down hill to the hay fieldThe view uphill to the house around the curve.
Tag Archives: Excavation
Poking out from under
Grading at Hancock Shaker Village
Digging out to let the sun in
Looking East
Pouring the foundation
Events are moving quickly
All of our utilities will enter the house under the footing. Two inch conduit will carry all our services into the lower level utility room. The conduit is placed under the rigid foam insulation, and under the lower level slab.
In front is the additional excavation for the lower level frost wall beneath the future sliding door entrance.