Category Archives: BUILDING A PASSIVE HOUSE
HRV up and running
Porch
We have a sink
The Magic Box: Zehnder ComfoAir 350 Luxe HRV
Building the porch
Furring out the inside
Climbing the new stairs
If felt great to see Nicholas run up and down these stairs. We are one step — or 15 steps — closer to home. Nick did the math and installed the stringers and Chris pounded on the temporary treads. We’ll probably paint this staircase, which goes down to the lower level. It is long because the ‘basement’ ceiling is more than 9 feet high.