This is the first opportunity to get a sense of inside space in our new house. This view is looking South to the lower level sliding door entrance. The ground beyond will be excavated out after the completion of the foundation.
Category Archives: 1. DIG TO DECK
Installing rebar
Vapor barrier running over footing and under walls
For perfect air sealing, moisture control and maximum energy efficiency. A 10 mil plastic sheet extends from under the lower floor slab (not yet poured). The sheet passes over the footing and under the yet to be constructed wall (rebar shown in place). Outside, the sheet will help seal the foundation wall.