Frost wall is insulated and backfilled Posted on April 24, 2012 by admin The footing and South end frost wall have been brought up to level, ready for the foundation walls.
Raising the frost wall Posted on April 17, 2012 by admin Sliding glass doors will allow us to walk out of the lower level (after a lot more excavation to the South). Extra deep footings are required to get below the excavated entrance.
The pour begins Posted on April 14, 2012 by admin The site surrounding the excavation was prepared so that the concrete truck could drive around the edge of the excavation throughout the pour.